
Reliable Custom Drinkware Supplier for the USA Market
We supply high-performance stainless steel drinkware to USA businesses with strict adherence to compliance, timelines, and quality standards.
Key Decision Data
- Minimum Order Quantity (MOQ):500 - 1,000 units (depending on customization level)
- Typical Lead Time:35-45 days (Production + DDP Shipping to US Door)
- Customization Capabilities:Laser Engraving, Silk Screen, 3D Printing, Custom Packaging
Confirm Project Feasibility
Submit your project details to verify if our manufacturing capabilities align with your procurement requirements.
Why Procurement Teams Choose Us
We understand the internal pressures of B2B procurement. Our process is designed to mitigate the risks commonly associated with overseas manufacturing.
Compliance & Safety Assurance
We proactively manage FDA and Prop 65 compliance. You won't face unexpected customs holds or liability issues due to non-compliant materials entering the US market.
Consistent Mass Production
Our QC protocols are stricter than standard AQL. We ensure the 1,000th unit looks exactly like the pre-production sample, preventing "golden sample" traps.
Transparent DDP Logistics
We handle the complexity of US tariffs and freight. The price and timeline we quote include delivery to your warehouse door, eliminating hidden import costs.

We strictly use food-grade 304 (18/8) stainless steel for all hydration surfaces.
Production-Ready Specifications
We focus on specifications that are optimized for stability in mass production, ensuring your order is delivered without quality variance.
Core Materials
Double-wall vacuum insulated 304 Stainless Steel (Inner/Outer). BPA-free PP lids and silicone seals.
Standard Capacities
12oz, 16oz, 20oz, 24oz, 32oz, 40oz (US Standard sizing).
Surface Treatments
Powder Coating (Durable, Texture), Spray Painting (Gloss/Matte), Water Transfer (Patterns), Electroplating.
Packaging Options
Standard egg-crate bulk packing (Cost-effective), White box, Custom color box, Cylinder tube.
Standard Project Workflow (USA)
Requirement
Confirm specs, qty, and target price.
Sampling
Physical proof sent to US office (5-7 days).
Approval
Sign-off on 'Golden Sample' & PO issuance.
Production
Mass manufacturing (25-35 days).
Delivery
Sea freight + UPS/FedEx last mile.
Critical Checkpoint: Sampling
For US clients, we strongly recommend physical sampling before mass production to verify color accuracy (Pantone matching) and lid fit, which are common points of misalignment in remote procurement.
US Compliance & Safety
Ignoring compliance is the fastest way to have a shipment seized at the border or face a recall. We ensure all products meet:
- FDA GRAS (Generally Recognized As Safe):
All food-contact materials (steel, plastic, silicone) are tested and certified.
- California Proposition 65:
Strict adherence to lead and phthalate limits, crucial for distribution in CA.
The "Cheap Steel" Trap
Many low-cost suppliers substitute 304 stainless steel with 201 grade to cut costs. 201 steel is prone to rusting when exposed to acidic beverages (coffee, juice) over time.
Consequence: Negative brand perception and potential product recalls within 6 months of use. We guarantee 304 grade for all inner liners.
Who We Serve
Corporate Gifting Programs
HR and Marketing teams sourcing high-quality welcome kits or holiday gifts for US-based employees. Requirement: Premium feel, consistent branding.
Retail & Coffee Chains
Regional coffee shops or lifestyle brands launching private label merchandise. Requirement: Retail-ready packaging, durable coating.
Event & Conference Organizers
Large-scale trade shows requiring bulk hydration solutions. Requirement: Strict delivery deadlines, cost-effective logistics.
Proven Supply Chain Experience

Our logistics team ensures your bulk order is packed securely for trans-Pacific shipping.
Ready to Validate Your Procurement Plan?
When to submit a request:
- You have a defined budget and estimated quantity (500+ units).
- You need to confirm if your target delivery date is realistic.
- You want to verify technical feasibility of your design.
*If you are still in the early brainstorming phase without a budget, we recommend browsing our Product Catalogue first to narrow down your preferences.
No obligation. We simply confirm if we are the right fit for your project.